Send Message
Shenzhen Benky Industrial Co., Ltd. 86-0755-29820527-888 marketing@cnbenky.com
Brass Copper CNC Machining Metal Parts For Highlights Knob

Brass Copper CNC Machining Metal Parts For Highlights Knob

  • High Light

    OEM Brass CNC Machining Metal Parts

    ,

    ODM Precision Brass Turned Parts

    ,

    ODM CNC Machining Metal Parts

  • Material
    Aluminum, Brass, Bronze, Copper, Hardened Metals, Precious
  • Surface Treatment
    Powder Coating,electroplating,oxide,anodization
  • Place Of Origin
    Shenzhen, China
  • Product Name
    Highlights A Knob
  • Roughness
    Ra0.2-Ra3.2(Custom Available)
  • Equipment
    CNC Machining Center,CNC Lathe
  • Place of Origin
    China
  • Brand Name
    Customized
  • Certification
    IS9001, ISO/TS16949, EICC, and Dun & Bradstreet certification,SGS
  • Model Number
    Custom made
  • Minimum Order Quantity
    5PCS
  • Price
    0.1-1
  • Packaging Details
    Part in Bubble Bag, then in Cartons, Wooden Pallet on Bottom, Film wrapped overall then Nylon belt fastened Or to be Customized Means of Packing.
  • Delivery Time
    5-10 work days
  • Payment Terms
    L/C, D/A, D/P, T/T, Western Union, MoneyGram
  • Supply Ability
    500,000/month

Brass Copper CNC Machining Metal Parts For Highlights Knob

Brass Copper CNC Machining Metal Parts For Highlights Knob

Custom Brass Copper Steel OEM ODM Lathe Machining Metal Spare Parts Custom CNC Turning for Highlights knob

In order to complete the fast delivery of large quantities of parts, VMT is equipped with 200 CNC machining centers, including 5-axis & 4-axis (Matsuura multi-table) also machining centers imported from Japan, a turning-milling compound machine (citizen). Provide free service design, project review and DFM analysis. In order to ensure the quality of parts, we passed the ISO9001 quality system and SGS On-site factory audit in 2015.

 

One-Stop Supplier For Cnc Machining Parts

Materials

Metal: Titanium, Aluminum, Stainless steel & Steel, Brass,copper,iron, zinc, etc

Plastic: POM, PEEK, ABS, Nylon, PVC, Acrylic, etc

Our Service

CNC turning, CNC milling, CNC turned-milled, Laser cutting,Sheet metal bending and welding fabrication

Surface Treatment

Powder Coated, (Ordinary & Hard) Anodized, Electropolished & Polished, Plating, Bead Blasted, Heat treatment, Passivate, Black Oxidate, Brushing, Laser Engraving

Tolerance&Surface Roughness

+/-0.005 - 0.01mm (Customize avaiable)&Ra0.2 - Ra3.2 (Customize avaiable)

Lead Time

1-2 weeks for samples, 3-4 weeks for mass production

Drawing Attached

Solid Works, Pro/Engineer, UG,Auto CAD(DXF, DWG), PDF

Payment Terms

Trade Assurance,Paypal,T/T, Western Union,Cash,E-Checking,Credit-Card

Packing Detail

1.Eco-friendly pp bag / EPE Foam /Carton boxes or wooden boxes
2.As customer's specific requirements

 

Our Benefits

1.Sample Order and Small Order are acceptable,24 hours online service & Quickly Quote/Delivery.

2.The methods of delivery: DHL,EMS,UPS or Fedex (fast and safer).

3.Located in manufacturing base of China-ShenZhen city,we also help customer design according to customers' requirements and products' application.

 

 

 

Brass Copper CNC Machining Metal Parts For Highlights Knob 0


 

 

Brass Copper CNC Machining Metal Parts For Highlights Knob 1Brass Copper CNC Machining Metal Parts For Highlights Knob 2

Q:Where is your factory?

A:We are located in ShenZhen ,China. It is near the ShenZhen airport .

Q: What kind of drawing is perfect ?

A:2D drawing ( PDF, DWG/DXF) 3D drawing ( STEP, XT, IGS,SolidWorks parts )

Q:Do you accept the OEM sample and small production ?

A:Welcome ! the sample can help you verify your design and our quality !

Q: Is it safe of my drawing and design ?

A:we can sign the NDA with you .second All of the customer's drawing only use for the processing and inspection .don't copy and show others .

Q: How to payment ?

A;Alibaba Trade Assurance/ Bank payment / PayPal (Only support the small payment )

Q:What is lead time for order?

A:In General , For sample , it takes about 7-10 days , and for mass production, it takes14-20 days.