SKD61 H13 Custom Aluminum Die Casting Parts Aluminum Alloy Enclosure
Custom Aluminum Alloy Die Casting Auto Spare Parts, Custom Aluminum Die Casting Parts For New Energy Enclosure
We can process aluminium, magnesium, zinc alloy, steel and stainless steel products. Surface treatment includes spraying, electroplating, electrophoresis and anodizing.The company has foreign trade department, engineering department, quality department, assembly and packaging department, production department (mould making, die casting, CNC, post-processing), engineering and technical personnel 40, quality management personnel 30.
We have accumulated rich experience in die design and manufacturing for the customers in different fields, and have obtained notable strengths in automobile, new energy, communication, medical care and other sectors.
|
SKD61, H13
|
|
Single or multiple
|
|
50K times
|
|
1) ADC10, ADC12, A360, A380, A413, A356, LM20, LM24
2) Zinc alloy 3#, 5#, 8#
|
|
1) Polish, powder coating, lacquer coating, e-coating, sand blast, shot blast, anodine
2) Polish + zinc plating/chrome plating/pearl chrome plating/nickel plating/copper plating
|
|
1) According to customers' drawings
2) According to customers' samples
|
|
step, dwg, igs, pdf
|
|
ISO 9001:2015 & IATF 16949
|
|
T/T, L/C, Trade Assurance
|
FAQ:
Q1. Are you a factory or trade company?
We are a factory located Shenzhen China.
Welcome to visit our factory.
Q2. What kind of production service do you provide?
Mold making, die casting, CNC machining, stamping, plastic injection, assembly, and surface treatment.
Q3. How about the lead time?
Mold: 3-5 weeks
Mass production: 3-4 weeks
Q4. How about your quality?
♦We have got ISO9001:2015 and IATF16949 certificates.
♦We will make the operation instruction once the sample is approved.
♦We will 100% inspect the products before shipment.
♦Transactions can be through Alibaba's trade assurance.
Q5. How long should we take for a quotation?
After receiving detailed information(your 2D/3D drawings or samples), we will quote you within 2 days.
Q6. What is your quotation element?
Drawings or Sample, Material, Finish, and Quantity.
Q7. What is your payment term?
Mold: 50% prepaid, balance after sample approval.
Goods: 50% prepaid, balance T/T before shipment.