【Part name】 Processing of shell parts of automobile transmission equipment
【Manufacturing process】CNC precision machining
【Surface treatment】 Grinding polishing + blue oil injection
【Product Features】 High precision complex structure
【Processing Equipment】
3-axis / 4-axis / 5-axis CNC machining centers (computer gongs), drilling tapping machines, CNC lathes, precision grinders, gantry milling machining centers, molding machines, hot-pressing tanks, western machines, wire cutting (fast / medium / slow walking) Wire) other processing equipment.
【Accuracy size】
Precision of metal parts:
Milling tolerance ± 0.01mm, turning tolerance ± 0.005mm
Plastic parts accuracy: ± 0.05mm
Size: 2200mm larger (removable parts are limited by size)
【Quantity Delivery】
Samples (1 order): 2-7 days
Small medium batch processing: 7-20 days
Mass production: 20-35 days
【material】
Metal: aluminum alloy, magnesium alloy, magnesium lithium alloy, low carbon steel, stainless steel, titanium alloy, copper, etc.
Plastic: ABS, PC, POM, PEEK, PP, acrylic (PMMA), nylon, Teflon, PPS, nylon + glass fiber, etc.
Composite material: carbon fiber
【Surface treatment】
After processing most of the surface of automobile shell parts, such as sand blasting, hard anodizing, micro-arc oxidation, grinding, polishing, oil spraying, blackening, electroplating, vacuum plating, chemical plating, phosphating, passivation, silk screen, flower Treatment process.
FAQ:
Q1: How to enjoy the OEM services?
A1: Usually, base on your design drawings, we give some technical proposals and a quotation to you, after your agreement, we produce for you.
Q2: Can I get a sample for quality check?
A2: Sure, We are willing to provide with sample for quality and function testing.
Q3: Will my drawings be divulged if you benefit?
A3: No, we pay much attention to protect our customers’ privacy of drawings, we can sign NDA.
Q4: How do you control the quality?
(1)Material inspection--Check the material surface and roughly dimension. (
2)Production first inspection--To ensure the critical dimension in mass production.
(3)Sampling inspection--Check the quality before sending to the warehouse.
(4)Pre-shipment inspection--100% inspected by QC team before shipment.
Q5: How about the lead time?
A5: Generally, 10 -15 days for samples, 25 -30 daysfor mass production.