Custom Precision CNC turning Machining Aerospace Equipment Parts Processing
【Parts name】 Aerospace equipment parts processing
【Manufacturing process】CNC lathe processing
【Surface treatment】 Gold plating
【Product Features】 High processing accuracy good gold plating effect
【Processing Equipment】
3-axis / 4-axis / 5-axis CNC machining centers (computer gongs), drilling tapping machines, CNC lathes, precision grinders, gantry milling machining centers, molding machines, hot-pressing tanks, western machines, wire cutting (fast / medium / slow walking) Wire) other processing equipment.
【Accuracy size】
Precision of metal parts:
Milling tolerance ± 0.01mm, turning tolerance ± 0.005mm
Plastic parts accuracy: ± 0.05mm
Size: 120mm diameter (removable parts are limited by size)
【Quantity Delivery】
Samples (1 order): 2-7 days
Small medium batch processing: 7-20 days
Mass production: 20-35 days
【material】
Aerospace equipment parts processing metals: aluminum alloy, magnesium alloy, magnesium-lithium alloy, low carbon steel, stainless steel, titanium alloy, copper, etc.
Plastic: ABS, PC, POM, PEEK, PP, acrylic (PMMA), nylon, Teflon, PPS, nylon + glass fiber, etc.
Composite material: carbon fiber
【Surface treatment】
Sand blasting, hard anodizing, micro-arc oxidation, grinding, polishing, oil spraying, blackening, electroplating, vacuum plating, chemical plating, phosphating, passivation, screen printing, flower biting, most other surface post-treatment processes.
Products Description
FAQ:
1.Are you a manufacturer or a trading company?
We are a 30,000-square-meter factory with 30years experience found in 1990 located in Shenzhen China.
2.How can I get a quote?
Detailed drawings (PDF/STEP/IGS/DWG...) with material, quantity, surface treatment and tolerance requirement.
3. Can I get a quote without drawings?
Sure, we appreciate to receive your samples, pictures or drafts with detailed dimensions for accurate quotation.
4.Will my drawings be divulged?
No, we pay much attention to protect our customers’ privacy of drawings, signing NDA is also accepted if need.
5. Can you provide samples before mass production?
Sure, sample fee is needed, will be returned when mass production if possible.
6. How about the lead time?
Generally, 1-2 weeks for samples, 3-4 weeks for mass production.
7. How do you control the quality?
(1) Material inspection--Check the material surface and roughly dimension.
(2) Production first inspection--To ensure the critical dimension in mass production.
(3) Sampling inspection--Check the quality before sending to the warehouse.
(4) Pre-shipment inspection--100% inspected by QC assistants before shipment.
8. What will you do if we receive poor quality parts?
Please kindly send us the pictures, our engineers will find the solutions and remake them for you asap