Professional factory accept OEM order and customization according to the customers' requirement.
Main Materials of CNC Machining Parts
Surface Treatment of CNC Machining Parts
Specification Of CNC Machining Parts
(Aluminum die casting) | Europe Brand: EN-AC 46100,EN-AC 46000,EN-AC 47100 ECT |
Japan Brand: ADC12,ADC3,ADC5,ADC10 ECT | |
Other all kinds of Aluminum Alloy as Customer Required | |
Product Material | GB/T13812-92: ZZnAI4Y YX040 ZZnAI4Cu1Y YX041 ZZnAICu3Y YX043 |
(Zinc die casting) | EN 12844-1998: ZP0400 ZP3 ZP0410 ZP5 ZP0430 ZP2 ZP0810 ZP8 ZP1110 ZP2720 ZP27 ZP0010 ZP16 |
ASTM B 6-2003: Z13001 Z15001 Z19001 | |
JIS H 5301-1990: ZDC1 ZDC2 | |
Other all kinds of Zinc Alloy as Customer Required | |
Mold material | H13 Steel, 2344 Steel, DIEVAR Steel |
Mold cavity | 1 cavity, 2 cavities, 4 cavities, 8 cavities |
Mold lifetime | 50000-100000 shoots |
Quality control | Surface, Dimensions, Threads, Balance, Gas Density, Material |
FAQ:
Q1.How to have my components quoted ?
A1: Please contact us and send us your drawings inclusive of 2D and 3D (.STEP or .IGE file) and detail requirements. We are pleased to sign NDA with you if you prefer. Then our engineering team will work on them and submit competitive quotation to you.
Q2.What is the lead time for tooling and samples fabrication?
A2: The exact lead time depends on your parts specification.
The normal lead time is 40*45 days for tooling fabrication and samples.
If the tooling is not required, the lead time for samples is 15 days normally.
Q3.Can I have prototypes for testing before tooling ?
A3: Yes, our factory have team to support prototypes with machining process to fabricate them for your testing.
Q4.How to ship the samples and production order ?
A4: We will normally ship samples via DHL, UPS or FedEX via our cooperated forwarder or freight collect. For the shipping of production order, it will be by sea or by air
Q5.How to ensure the quality of parts?
A5: Firstly, our team will inspect all incoming material. QC team will inspect parts while production and finished products, then submit Quality Inspection Report together with samples and production order.